The properties across this Northampton estate had hanging tile exteriors that needed replacing as part of a wider programme to improve fire safety, thermal performance and energy efficiency across Northampton Partnership Homes housing stock.

Delivering this required a full strip-out of the existing external system, right back to the cavity, before a new, upgraded specification could go in. It’s a technically demanding scope of work, carried out across occupied homes while keeping residents’ day to day disruption to a minimum.

The Challenge

The properties across this Northampton estate had hanging tile exteriors that needed replacing as part of a wider programme to improve fire safety, thermal performance and energy efficiency across Northampton Partnership Homes housing stock.

Delivering this required a full strip-out of the existing external system, right back to the cavity, before a new, upgraded specification could go in. It’s a technically demanding scope of work, carried out across occupied homes while keeping residents’ day to day disruption to a minimum.

The Solution

Working as a joint venture, M3 and FSG combined resources, expertise and teamwork to deliver a consistent, high-quality result across every property in the programme. Full scaffolding was installed throughout to allow safe, efficient access for the scale of work involved.

  • Removal of existing hanging tiles, insulation and battens back to the cavity
  • Installation of 175mm fire-rated insulation
  • Fitting of fire board and plywood
  • Application of a breathable membrane
  • Installation of intumescent strips
  • Fitting of Hardie® Plank cladding

Phase 1 saw 24 properties completed to this new specification. With that phase successfully delivered, the same team is now well underway on Phase 2, continuing the transformation across the wider estate.

The Result

The completed properties now have a fully upgraded external wall system, finished with modern Hardie® Plank cladding and backed by a significantly improved fire safety and thermal performance specification. These upgrades will make a real, lasting difference to residents, improving comfort and energy efficiency for years to come.

Before

After

Our Cladding Installation Service

M3 installs cladding for homeowners, landlords and housing associations across Northampton, Milton Keynes and the surrounding counties, working with fibre cement and composite systems including James Hardie HardiePlank, Marley Eternit weatherboard and Swish UPVC shiplap.

We cover whole houses, extensions, garages and commercial buildings, plus larger phased programmes like this one, where the work also includes insulation, membranes and fire safety detailing behind the finish.

Contact Us

Project Overview

Client: Northampton Partnership Homes (NPH)
Location: Northampton
Delivery Partner: Joint venture between M3 and FSG
Phase 1: 24 properties completed
Phase 2: In progress
Specification: 175mm fire-rated insulation, fire board, plywood, breathable membrane, intumescent strips, Hardie® Plank cladding